CRL 1.9" Schedule 40 Post Railing Connector Sleeve

  • Provides Proper Alignment Between Railing Splices

  • Shaped to Fit and Ready-to-Install in Pipe Railings Shown Above

  • For Use with PR15BS/PR15PS 1-1/2" (38.1 mm) Schedule 40 Stainless Steel Pipe Rail Tubing

  • SKU: PR19CSS


    price: $73.88


    Other Products/Finishes:
    1. GR19CSM - CRL Aluminum 1.9" Connector Sleeve for Cap Railing, Cap Rail Corner, and Hand Railing
    2. PR19CSS - CRL 1.9" Schedule 40 Post Railing Connector Sleeve

    Description:
    Catalog Number:PR19CSS
    Also Available in These Catalogs:
    CRL63R Architectural Railing Systems, PAGE 284R
    HR11 Architectural Railing Systems 2011, PAGE B264
    Length:5" (127 mm)
    Ship Via:Can Ship UPS
    Shipping Weight:1 lb (454g)
    Minimum Order:1 Each


    CRL Connector Sleeves are used to connect and provide proper alignment between Hand Railing and Pipe Railing splices. The 5" (127 mm) long Connector Sleeves must be compressed to fit inside the Hand Railing. Use of our Cat. No. 32629 Metal Contact Cement is required to achieve a secure and permanent bond at all connections.


    More Description:
    IMPORTANT INSTALLATION NOTE: Always Use Connector Sleeves Made of the Same Metal as the Cap Rail, Cap Rail Corner, or Hand Rail Metal.
    Important Notes::

    Most shipping weights are approximate and have not been verified. If the exact weight is needed in order to determine shipping costs, and shipping costs are required in order for you to complete your order, please request this prior to submitting your order by contacting Knock On Glass customer service. Product images shown are of the actual product or a close representation. ColorsColours can vary depending on your computer's video card and on how your monitor's colorcolour is adjusted.